5-week complete fit-out working acting as the main contractor

Work Undertaken

  • Trades on this site included
    • Flooring
    • Plumbers
    • Electricians
    • CCTV
    • Fire Alarm
    • HVAC engineers
    • Signage
  • Construct new offices and staff areas including building fully insulated stud walls and new mf ceilings.  Supporting steelwork also had to be installed.
  • Finishes included plastering, painting, new joinery, and flooring
  • Construct a wash bay including all plumbing and drainage and installation of an interceptor tank
  • Updating of the power and data including power for external lighting and signage
  • Installation of fixtures and fittings including bespoke reception desks
  • Installation of comfort cooling HVAC system and fire alarm and CCTV systems